BI/HTOL/LU/ESD(HBM/CDM)/THB or BHAST/PCT
Pages
- Home
- Cloud & Edge Computing
- Machine Learning & AI
- Microprocessors & Servers
- HDI Packaging Technologies
- Packaging Technologies (CSP, FCXGA, POP)
- Project Management 101
- Six Sigma & Statistics
- Reliability Engineering
- Package Design / Product Development
- 3DIC.ORG [Fan Out]
- 3DIC.ORG [2.5D/3D]
- Semi Accurate
- The Inquirer
- Feedly-Tech
- Semiconductor Packaging
- Advanced Packaging
- Silicon Far East
- Post Silicon Platform Validation
- Online Articles -AI/ML
- Online Articles - Packaging
Search This Blog
Showing posts with label Reliability Engineering. Show all posts
Showing posts with label Reliability Engineering. Show all posts
Sunday, October 22, 2017
Tuesday, October 25, 2016
Fails - Exact or Censored
Right censored or suspended = Unit has survived when test is stopped
Interval censored = Unit has failed between "Last Inspection" and now
Left censored = Similar to Interval Censoring but "Last Inspection"/Start is 0
Extrapolating Accelerated Test TTF to Predict Use Level Lifetime
Fit TTF data to life-distribution (for eg. 2P Weibull) for each stress level, and estimate parameters - each distribution with different eta but same beta (for the same failure mechanism).
Life distribution characteristic (eta) is a function of stress & is equated to stress level using a given Life-Stress-Relationship (LSR) - for eg Eyering Model
Estimate model constants
Now, knowing model constants, estimate eta at various stress levels, including at use level. And knowing beta (for the given failure mechanism) use-level life distribution can be predicted.
Monday, October 24, 2016
FIT Rates
Hazard rate is instantaneous failure rate. But usually, average failure rate for a given time period is more useful, for eg. failure rate per hour.
FIT rate is defined as ppm failure per 1000 hours or number of fails per 10^9 device hours.
Multiply hourly fail-rate by 10^9 to generate FIT rate.
Hourly fail rate = No of rejects / (No of devices x No of hours x AF)
FIT rate = Hourly fail rate x 10^9
No of rejects is determined by Chi-square distribution = [(x^2)/2], commonly at 60% confidence (alpha) and dof: 2r + 2
Saturday, August 22, 2015
MS&V
Swept sine tests: SHM with logarithmic sweep of frequency range from min-to-max, 4 times (4 mins each time) for each of X, Y, Z axes.
Peak acceleration (G), Peak displacement, crossover freq, freq range -for each use condition.
Example: Service condition 1, 20-2KHz, 4 mins/cycle, 4 cyc/axis, 3 axis.
Random vibration:Vibration applied for 30 minutes in each of the 3 orthogonal axes, X, Y, Z
RMS acceleration (G), RMS displacement, RMS velocity, - for each use condition
For each use condition, the selected test parameters above result in PSD values for different frequencies, generating plots/profiles showing PSD (intensity of acceleration power, measured in G^2/Hz) variation across a range of frequencies (2-500Hz).
Area under PSD-frequency plot is RMS acceleration (G)
Mechanical Shock JESD22-B110B:
Component or sub-assembly free-state: 5 shocks x 3 axes (X, Y, Z) x 2 directions/axis, minimum (total) 30 shocks
Sub-assembly mounted: 2 shocks x 3 axes (X, Y, Z) x 2 directions/axis, minimum (total) 12 shocks
Peak acceleration (G), pulse duration, velocity change, equivalent drop height.
Example: Service cond. B, 1500G, 0.5 ms, 5 times/axis, 6 axis
Thursday, August 13, 2015
Power cycling
Monday, April 29, 2013
Failure Analysis Techniques: Resolution
Failure Analysis: Tools & Techniques
Topography: SEM (low voltage, inelastic collisions, higher resolution, low contrast) /BSE (high voltage, elastic collisions, lower resolution, high contrast)
Morphology: (lattice geometry, crystallographic structure) EBSD/TEM/AFM/STM
Material analysis:
Elemental: EDX/WDX/XRF
Chemical: (structural bonds, oxidation states) AES/XPS/EELS/SIMS/FTIR
Interaction between primary electrons & matter: SEM, TEM, BSE, EBSD, EDX & WDX
Interaction between primary X-Rays & matter: XPS, AES, XRF
Other techniques: Opticals, X-Rays, CSAM, Curve Trace, TDR, IR & thermal imaging, SQUID, LSM (LIVA/OBIC for opens & TIVA/OBIRCH for shorts), x-sections, P-laps & FIB cuts
Making Sense of Physics-of-Failure Based Approaches
1. Study of the hardware configuration: geometry, design, materials, structure
2. Study of life cycle loads: operational loads (power, voltage, bias, duty cycle) & environmental loads (temperature, humidity, vibration, shock)
3. Stress analysis: Stress-strength distributions/interference, cumulative damage assessment & endurance interference, FMEA, hypothesize failure mechanisms, failure sites & associate failure models, root cause analysis, calculate RPN's to rank & prioritize failures.
4. Reliability assessment: Rel metrics characterization, life estimation, operating/design margin estimation.
5. Interpret & apply results: Design tradeoffs & optimization, ALT planning & development, PHM & HUMS planning.
Hypothesis Tests : Which & When?
1-sample or 2-sample: Use z-test for n>=30 or when population variance is known, else use t-test
> 2-samples: Use ANOVA
Test of Variances:
1-sample: Use Chi-square test
2-samples: Use F-ratio test
Test of Proportions:
1-sample or 2-sample: Use z-test
>2-samples: Use Chi-square test
Distributions
Hypergeometric: Probability of r rejects in n sample size for N population size with d total rejects. (Intended for small, finite, well characterized populations)
Binomial: Probability of r rejects in n sample size, where n < 10% of N population size, where chance of success in any given trial always stays the same (p)(Intended for large population sizes)
Poisson: Probability of r rejects (=defects or events) in infinite population size, for a given failure rate (lambda). (Intended for n->infinity & p->0)
Binomial distribution approximates Hypergeometric distribution for large N.
Poisson distribution approximates Binomial distribution when N tends to infinity.
Distributions for Continuous Data: Normal, Lognormal, Exponential, Weibull
SPC/Control Charts
For variable data, use I-MR (for n=1), X(bar)-R (for n = 2 to 10) or X(bar)- s (for n>10)
For attribute data:
1. Count/proportion of defectives is estimated through binomial distribution. For constant sample size(n), estimate count of defectives using np chart, while for variable sample size, estimate proportion of defectives using p-charts.
2. Count/rate of defects is estimated through poisson distribution. For constant sample size(n), estimate count of defects using c-chart, while for variable sample size, estimate rate of defects using u-chart.
Six Sigma & Process Variation
-Approx 68% of variation is contained within +/- 1sigma
-Approx 95% of variation is contained within +/- 2sigma
-Approx 99.7% of variation is contained within +/- 3sigma
Cp = 1 when +/- 3 sigma is contained within spec limits.
Cp = 1.33 when +/- 4 sigma is contained within spec limits.
Cp = 1.50 when +/- 4.5 sigma is contained within spec limits.
Cp = 1.67 when +/- 5 sigma is contained within spec limits.
Cp = 2.00 when +/- 6 sigma is contained within spec limits.
Acceptance sampling: LTPD & AQL
LTPD = definition of a threshold bad lot.
The sampling plan is designed around the AQL/LTPD such that it defines:
1. MAX chance of ACCEPTING lots of quality that is equal or worse than LTPD. This chance/risk is BETA or CONSUMER's RISK.
2. MAX chance of REJECTING lots of quality that is equal or better than AQL. This chance/risk is ALPHA or PRODUCER's RISK.
Alpha (Probability of rejection) is usually set to 0.05. This equates to 95% chance/confidence of acceptance.
Beta (Probablility of acceptance) is usually set to 0.10. This equates to 90% chance/confidence of rejection.
Power, Confidence, Error, Significance
Accept null hypothesis when false (or false negative) = beta or Type 2 error
Reject null hypothesis when false: POWER = (1-beta)
Accept null hypothesis when true : CONFIDENCE (= 1-alpha)
At high power, beta is small => alpha is large => likely that p-value will be < alpha (significance level). Most effects tend to be deemed significant.
At low power, beta is large => alpha is small => likely that p-value will be > alpha (significance level). Most effects tend to be deemed insignificant.
Thursday, April 25, 2013
2.5/3D TSV & Silicon Interposers: Weighing Pros v/s Cons
Product Development: Womb to Tomb, Cradle to the Grave
Six Sigma : Process & Design
Process: Aims to reduce process variation
Define: Plan, scope, charter, schedule, team, objectives, milestones, deliverables
Measure: MSA, GR&R, Process Capability, Yields
Analyze: Hypothesis tests, ANOVA, PFMEA, Process Maps (KPIV/KPOV)
Improve: DoE
Control: SPC, Control Charts
Design: Aims to reduce cycle time and need for rework
Define: Plan, scope, charter, schedule, team, objectives, milestones, deliverables
Measure: Baseline, benchmark, functional parameters, specs & margins
Analyze: DFMEA, Risk analysis, GAP analysis
Develop: Deliver design
Optimize: DfX - tradeoffs
Validate: Prototype builds
Firefighting through methodical madness
1. Develop Team
2. Define Problem: Failure rate, lots affected, establish scope
3. Containment: Raise red flags, lots on hold, generate documentation, reliability assessment, sampling plans, increased checks & balances
4. Problem analysis: Process mapping, history tracking, establish commonalities & dependencies, consult FMEA, RCA/5W/5M, failure analysis, establish hypotheses, develop CAPA theories (short-term/mid-term/long-term)
5. Verify corrective actions: Engineering studies to duplicate problem and verify effectiveness of CA
6. Implement corrective action: Release lots, provide disposition, soft ramp through full release with increased sampling, document lessons learnt
7. Implement preventive action: Mid-term/long-term actions to prevent any recurrences in future
8. Congratulate team
Subscribe to:
Posts (Atom)
Smartphone Components
Antenna + Switch & RFFE, Filter, Duplexer, Amplifier, Transceiver, Baseband, Application Processor [SOC + LPDDR3], Memory [Flash / SSD...
-
Molded Embedded Packages seek to overcome warpage concerns and limitations in z-height that conventional PoP type packages suffer from, w...
-
AQL = definition of a threshold good lot. LTPD = definition of a threshold bad lot. The sampling plan is designed around the AQL/L...
-
L-Gate: Technology/Product Development L-1: Explore / PC1 L 0: Define / PC2 & T/O L 1: Enable/BKM determination L 2: Implement/BK...